Concrete wind turbine base at a Quebec wind farm
Concrete cooling · turnkey

Concrete cooling Groupe Glascold Inc. delivers a turnkey solution, in a safe and healthy environment, with zero plastic waste.

Groupe Glascold Inc. specializes in manufacturing ice blocks for concrete cooling. Over the years, we have developed a unique block concept designed for producers carrying out large-scale projects. With a capacity of up to 1,200 blocks per day, we have never, in 15 years, let a single client run out of ice.

Calculator

Calculate your ice quantity

Based on the recognized method set out in Design and Control of Concrete Mixtures.

Open the calculator.
180
TPD — tons of ice per day
30
refrigerated trailers
25–30 t/h
crushing capacity
Groupe Glascold Inc. is the largest producer of ice blocks used for concrete cooling in Canada.
A complete solution

Everything to cool your concrete, in one place

❄

Concrete ice

Ice blocks are at the heart of our concrete cooling solution. By design, they are handled safely, crushed quickly, and help you achieve concrete that meets your specifications.

⚙

Crushers

Designed by a mechanical engineer holding a master’s degree. Our crushers are now built in stainless steel, driven by a transmission, beltless, UL 508A certified for the United States or CSA certified for Canada, and manufactured at our facility. A 300 lb (136 kg) block can be crushed in 13 to 20 seconds by a single operator. Our crushers are available for sale or rent.

See the ice crusher page

🚛

Refrigerated trailers

True mobile cold storage units operating in diesel or electric mode. Once on site, you simply plug them in.

From A to Z

From ice block to mixer, all in pictures

Here is our method, step by step. One operator is enough, with no heavy physical effort and no plastic bags.

1Ice blocks with notches for forklift forks

All by forklift, nothing by hand

Ice is produced in blocks at our plant, with no packaging. Each block is fitted with slots for the forklift forks, so the blocks do not slide sideways and can be handled safely, four 136 kg blocks at a time, for a total of 544 kg in a single movement. No load is lifted by hand, so there is no risk of back injury.

2Operator pushing ice blocks on the ice crusher feed table

One operator is all it takes, with moderate effort

The blocks are placed on a table with a UHMW plastic surface that makes it easy to slide them toward the crusher inlet. There is no strenuous manual handling and no error in the calculation of the ice quantity, resulting in a much safer working environment.

3Groupe Glascold Inc. ice crusher blowing ice into mixer 55

Crushing and direct blowing

The blocks are crushed and then blown directly into the mixer for fast and efficient loading. The operation is simple, smooth, and reliable, both on site and at the plant.

4Crushed ice loaded into mixer 59

The right temperature, right at loading

Finely crushed ice blends evenly into the concrete, allowing for a reliable temperature reading at loading. No more half-melted bagged ice causing unpleasant surprises on the job site.

Demonstration footage filmed in a controlled environment. The safety of our teams and compliance with standards guide every operation.

Our projects

Among the country's largest projects

Groupe Glascold Inc. has supplied ice and cooling equipment for major infrastructure and energy projects.

New Samuel De Champlain Bridge
Samuel De Champlain Bridge
Over C$4 billion project · 2017
Réseau express métropolitain (REM) light rail
REM
Metropolitan express network · C$9.4 billion project
Concrete wind turbine base, Seigneurie de Beaupré
Wind farms
Seigneurie de Beaupré and several other farms

Samuel De Champlain Bridge

Valued at over C$4 billion, the Samuel De Champlain Bridge was the largest job site in Canada at the time. We supplied the ice for the cast-in-place concrete with Lafarge, now Amrize. We also supplied the ice for all precast concrete produced by Béton Provincial, which was our client at the time and remains our client today.

REM — Metropolitan Express Network

One of the largest public transit projects in the country, with costs reaching C$9.4 billion according to the Auditor General. Groupe Glascold Inc. supplied all the ice used to cool the concrete on this major project, for both precast elements with Béton Provincial and cast-in-place structures with Unibéton.

›
Parc éolien des Érables — with Béton Chevalier
›
Parc éolien Rivière-du-Moulin — with Unibéton
›
Parc éolien Pierre-De Saurel — with Carrières de Saint-Dominique
›
Parc éolien Témiscouata — with Unibéton
›
Parc éolien Seigneurie de Beaupré — with Unibéton
›
Parc éolien Nation Rise — North Stormont, Ontario
In the field

Tested on site, bought the same day

After testing a crusher at our facility, Mr. Luc Ouimet, President of Carrière Bernier, quickly saw the full extent of the benefits this method could bring to his operations. Convinced by the equipment’s efficiency and its practical benefits, he purchased it on the spot. Less than an hour later, a truck was already on site to pick it up and install it at their concrete plant.

The main benefits observed are as follows.

Employee protection. The crusher allows one person to do the work with minimal physical effort. Without this equipment, four to five employees must be mobilized around the truck to open and empty thousands of ice bags one by one. This demanding, repetitive method significantly increases the risk of injury and accidents. Using the crusher simplifies the operation, makes it safer, and greatly reduces those risks.

Concrete quality. The ice produced by the crusher blends quickly and evenly into the mix. This makes it possible to obtain a reliable reading of the concrete temperature as the truck leaves the plant, since the ice is already well distributed throughout the load. This approach ensures greater consistency in the product and tighter quality control.

Quantity accuracy. Using ice blocks makes quantity control much simpler and more precise. For example, three blocks represent 408 kg of ice. To reach the same amount with bags, it takes about 34 bags of 12 kg or 27 bags of 15 kg. Over the course of a full day, when several employees are handling and counting hundreds or even thousands of bags, errors become almost inevitable. These variations, too much or too little ice, directly affect the temperature and slump of the concrete and can even compromise certain loads.

Environmental responsibility. Cooling concrete with bagged ice requires the use of thousands of single-use bags. These bags, generally made of petroleum-based polyethylene, generate a significant amount of waste and contribute to a very real environmental issue. By choosing the crusher and ice blocks, Carrière Bernier eliminates this source of waste at its origin. This choice reflects a clear commitment to a cleaner, more efficient, and more responsible method.

At Carrière Bernier, environmental responsibility is not a slogan, but a core value that guides the company’s decisions every day.

Carrière Bernier’s reputation for quality is built on thoughtful decisions, a skilled team, and high standards maintained at every stage of production. It is this constant commitment to doing things right that leads many contractors to trust them with their projects.

Groupe Glascold Inc. ice crusher loaded on the Carrière Bernier truck
Refrigerated trailers

True mobile cold storage units operating in diesel or electric mode. Once on site, you simply plug them in.

True mobile cold storage units operating in diesel or electric mode. Once on site, you simply plug them in.

Thermo King refrigerated trailer pulled by a Peterbilt
Thermo King refrigerated trailer pulled by a classic Peterbilt
Tanks

Tanks for rent

Groupe Glascold Inc. also offers 54,000-litre vertical tanks for rent, measuring 25 feet high by 10 feet in diameter.

Veilleux crane with white Groupe Glascold Inc. tanks
The difference

One person. Not four.

The bagged-ice method means a full crew opening thousands of bags by hand, with mountains of plastic waste to show for it. The Groupe Glascold Inc. method means a single operator and zero waste.

Four workers opening bags of ice by hand
The bagged method
4–5
people tearing bags open by hand
  • Plastic overuse
  • Heavy physical effort
  • Half-melted ice, imprecise reading
  • One miscount, and the whole load is wasted
Operator in a hard hat at the Groupe Glascold Inc. ice crusher
The Groupe Glascold Inc. method
1
a single operator, no heavy effort
  • Zero plastic waste
  • Safe and smooth
  • Fine ice, reliable temperature
Why Groupe Glascold Inc.

Safe, clean, and precise

Health and safety at work

No more opening and emptying thousands of bags by hand, bent over all day long. Everything is handled by forklift: no load is lifted manually, fewer workers are exposed, and the risk of injury is reduced to a minimum.

Zero plastic waste

Ice blocks with no packaging whatsoever. No plastic bags on site and no waste at the end of the day. A clean and responsible solution.

A reliable reading

The exact amount of ice is measured and controlled at loading to achieve the temperature required for your project. No guesswork.

Calculator

Calculate your ice quantity

Based on the recognized method set out in Design and Control of Concrete Mixtures.

Come meet us

Book an appointment, come visit our facility, and see our equipment. Direct contact is how we do business.

Groupe Glascold Inc.
875, chemin des Ormes
Saint-Jean-sur-Richelieu (Québec)
For information, email Yves Cloutier.
cloutiery@glascold.com
Ready to finalize your purchase? Call the owner, Yves Cloutier.
+1 450 357-9797
Call now